How Concrete Volume Is Calculated
Concrete volume depends on the shape being poured:
Slab or footing:
Volume (cu ft) = Length x Width x Thickness
Column (cylinder):
Volume (cu ft) = pi x (Diameter/2)^2 x Height
Convert cubic feet to cubic yards by dividing by 27. Convert to cubic meters by dividing cubic feet by 35.315.
Variable Definitions
Length: The longest horizontal dimension of the slab or footing in feet. Measure along the longest side of the formwork.
Width: The shorter horizontal dimension of the slab or footing in feet. For footings, this is typically 12-24 inches (1-2 feet).
Thickness: The depth of the slab or footing in feet. Standard slabs are 4 inches (0.333 ft). Enter the value in feet, not inches.
Diameter: The width across a circular column in feet. Standard Sonotube sizes range from 6 inches to 24 inches.
Worked Example
A patio project with one slab and two post footings:
- Patio slab: 12 ft x 10 ft x 0.333 ft (4 in) = 39.96 cu ft = 1.48 cu yd
- Footing 1: 2 ft x 2 ft x 1 ft = 4.00 cu ft = 0.148 cu yd
- Footing 2: 2 ft x 2 ft x 1 ft = 4.00 cu ft = 0.148 cu yd
Total = 47.96 cu ft = 1.776 cu yd = 1.358 cu m
60lb bags: 1.776 / 0.017 = 105 bags. 80lb bags: 1.776 / 0.022 = 81 bags.
With 10% extra: order 1.95 cu yd (about 116 sixty-pound bags or 89 eighty-pound bags).
Edge Cases and Advanced Scenarios
Ordering 10% extra for spillage: Concrete pours rarely match exact calculations. Ground is uneven, formwork is imperfect, and some concrete sticks to the mixing equipment. Always add 10% to your calculated volume. For sloped or rough terrain, add 15%.
Mixing ready-mix with bagged concrete: For projects between 1 and 3 cubic yards, you are in a gray zone. A ready-mix truck delivery (minimum order often 1 yard) may be more efficient than mixing 60+ bags by hand. Above 2 cubic yards, ready-mix is almost always faster and cheaper per yard.
What to Do with Your Result
- For projects under 1 cubic yard, buy bagged concrete from a hardware store. For larger projects, call a ready-mix supplier for a truck delivery quote.
- Rent a concrete mixer for projects between 0.5 and 2 cubic yards to save time and ensure consistent mixing.
- Schedule your pour on a mild day (50-80 degrees F) to allow proper curing. Extreme heat or cold compromises concrete strength.
- Build your formwork before ordering. Once concrete arrives or is mixed, you have about 90 minutes before it becomes unworkable.