How Concrete Volume Is Calculated

Concrete volume depends on the shape being poured:

Slab or footing:

Volume (cu ft) = Length x Width x Thickness V=L×W×T

Column (cylinder):

Volume (cu ft) = pi x (Diameter/2)^2 x Height V=π×(d2)2×h

Convert cubic feet to cubic yards by dividing by 27. Convert to cubic meters by dividing cubic feet by 35.315.

Variable Definitions

Length: The longest horizontal dimension of the slab or footing in feet. Measure along the longest side of the formwork.

Width: The shorter horizontal dimension of the slab or footing in feet. For footings, this is typically 12-24 inches (1-2 feet).

Thickness: The depth of the slab or footing in feet. Standard slabs are 4 inches (0.333 ft). Enter the value in feet, not inches.

Diameter: The width across a circular column in feet. Standard Sonotube sizes range from 6 inches to 24 inches.

Worked Example

A patio project with one slab and two post footings:

  1. Patio slab: 12 ft x 10 ft x 0.333 ft (4 in) = 39.96 cu ft = 1.48 cu yd
  2. Footing 1: 2 ft x 2 ft x 1 ft = 4.00 cu ft = 0.148 cu yd
  3. Footing 2: 2 ft x 2 ft x 1 ft = 4.00 cu ft = 0.148 cu yd

Total = 47.96 cu ft = 1.776 cu yd = 1.358 cu m

60lb bags: 1.776 / 0.017 = 105 bags. 80lb bags: 1.776 / 0.022 = 81 bags.

With 10% extra: order 1.95 cu yd (about 116 sixty-pound bags or 89 eighty-pound bags).

Edge Cases and Advanced Scenarios

Ordering 10% extra for spillage: Concrete pours rarely match exact calculations. Ground is uneven, formwork is imperfect, and some concrete sticks to the mixing equipment. Always add 10% to your calculated volume. For sloped or rough terrain, add 15%.

Mixing ready-mix with bagged concrete: For projects between 1 and 3 cubic yards, you are in a gray zone. A ready-mix truck delivery (minimum order often 1 yard) may be more efficient than mixing 60+ bags by hand. Above 2 cubic yards, ready-mix is almost always faster and cheaper per yard.

What to Do with Your Result

  • For projects under 1 cubic yard, buy bagged concrete from a hardware store. For larger projects, call a ready-mix supplier for a truck delivery quote.
  • Rent a concrete mixer for projects between 0.5 and 2 cubic yards to save time and ensure consistent mixing.
  • Schedule your pour on a mild day (50-80 degrees F) to allow proper curing. Extreme heat or cold compromises concrete strength.
  • Build your formwork before ordering. Once concrete arrives or is mixed, you have about 90 minutes before it becomes unworkable.

Frequently asked questions

How many bags of concrete do I need?

A 60lb bag covers about 0.017 cubic yards (0.45 cubic feet). An 80lb bag covers about 0.022 cubic yards (0.60 cubic feet). Divide your total cubic yards by the per-bag volume to get the bag count.

How do I calculate cubic yards of concrete for a slab?

Multiply length (ft) x width (ft) x thickness (ft), then divide by 27 to convert cubic feet to cubic yards. A 10x10 slab that is 4 inches thick needs (10 x 10 x 0.333) / 27 = 1.23 cubic yards.

Should I order extra concrete?

Yes. Order 10% extra to account for spillage, uneven ground, and formwork irregularities. For complex shapes or sloped ground, consider 15% extra.

What is the difference between a slab and a footing?

A slab is a flat, horizontal surface like a patio or garage floor. A footing is a thicker, narrower strip that supports walls or posts and transfers structural loads to the ground.

How thick should a concrete slab be?

Standard residential slabs are 4 inches thick. Driveways and garages should be 5-6 inches. Heavy-duty commercial floors may need 6-8 inches. Thicker slabs require more concrete but provide greater load capacity.

Can I mix different shapes in one pour?

Yes. Use this calculator to add slabs, footings, and columns in the same project. The total volume combines all shapes so you can order the right amount of concrete for the entire job.

Related calculators